Investment in Pollution Prevention and Control of Industrial Enterprises
Table No.: Basic Form 106
Unified Social Credit Code: 91440606617466142A
Issuing Authority: Ministry of Ecology and Environment
Organization Code:
Approving Authority: National Bureau of Statistics
Full Name of Reporting Entity (Official Seal):
Approval Document No.: National Statistics Regulation [20] No.
Is enterprise captive power plant: Yes □ No √
Validity period: 2017 to Month 20
Main Form Basic Form 106
Name of Existing Industrial Pollution Source Control Project
Project Type
Control Type
Start Month & Year
Completion & Commissioning Month & Year
Planned Total Investment
(10,000 RMB)
Cumulative Completed Investment by Year-end
(10,000 RMB)
Name of Pollution Control Project
Current-year Completed Investment & Funding Sources (10,000 RMB)
Newly Added Treatment Capacity
Total
Pollution Discharge Fee Subsidy
Other Government Subsidies
Enterprise Self-raised Funds
Bank Loans
Waste Gas Purification Treatment System
(Plasma + UV Photolysis)
95
0
0
0
95
0
160,000 m³/h
Continuation Form (I) of Basic Form 106
Name of Completed Environmental Acceptance Project under Three Simultaneous System
Project Start Time
Actual Total Project Investment
(10,000 RMB)
Actual Environmental Protection Investment
(10,000 RMB)
Newly Added Wastewater Treatment Capacity
(Ton/Day)
Newly Added Waste Gas Treatment Capacity
(m³/h)
Wastewater Treatment
Flue Gas Desulfurization
Flue Gas Denitrification
Other Waste Gas Treatment
Noise Control
Solid Waste Treatment
Greening & Ecological Protection
Others
Waste Gas Purification Treatment System
—
2018
75
100
160,000
Person-in-charge of Entity:
Auditor:
Filler: Liu Guangwen
Filling Date: January 18, 2018
Notes
Fill in separately by project; merging multiple projects is prohibited.
Completed environmental acceptance projects under the Three Simultaneous System refer to newly built, reconstructed and expanded projects with completed EIA approval and finished environmental acceptance within the survey year.
Existing industrial pollution source control projects officially constructed within the survey year and not included in Three Simultaneous System management shall be filled in Basic Form 106; completed environmental acceptance projects under Three Simultaneous System shall be filled in Continuation Form (I).
Project Type Code:
1 – Ongoing existing industrial pollution source control project
2 – Completed existing industrial pollution source control project in current year
Control Type Code:
1 – Industrial wastewater treatment
2 – Industrial flue gas desulfurization
3 – Industrial flue gas denitrification
4 – Other waste gas treatment
5 – General industrial solid waste treatment
6 – Hazardous waste treatment (self-built facilities)
7 – Noise control (including vibration)
8 – Electromagnetic radiation treatment
9 – Radioactive waste treatment
10 – Industrial enterprise soil pollution treatment
11 – Mine soil pollution treatment
12 – Purchase and installation of automatic online pollutant monitoring equipment
13 – Pollution control relocation
14 – Other treatment (including comprehensive prevention and control)
Unit of design capacity: wastewater treatment: ton/day; waste gas treatment: m³/h; industrial solid waste treatment: ton/day.
Basic Form 106: Item 6 ≥ Item 7; Item 9 = Item10+11+12; Item12 ≥ Item13
Continuation Form (I): Item17>Item18; Item18=Item19+20+21+22+23+24+25+26
Attached: Waste Gas Description
Guangdong Chengxin Packaging Co., Ltd.
- The sources and calculation instructions of industrial waste gas emissions are as follows:UV Photolysis & Low-temperature Plasma Purification System
(1) Printing Process: FQ-02245 (60,000 m³/h air volume × 8 hours × 300 days)
FQ-02246 (40,000 m³/h air volume × 8 hours × 300 days)
(2) Lamination Process: FQ-02247 (60,000 m³/h air volume × 8 hours × 300 days)
- Design parameters and operating costs of each waste gas treatment system:
After the company’s relocation in 2017, 3 sets of waste gas treatment equipment were installed, with a total investment of nearly RMB 750,000.
The annual operating cost (including electricity charges and
UV lamp replacement) is RMB 350,000.
Guangdong Chengxin Packaging Co., Ltd.
January 18, 2018